Color Steel Standard Roofing Roll Forming Machine

  • >=1 Sets
    $13,500.00
Model Number:
YX27-200-1000
Power(W):
5.5KW
Shipping:
Support Sea freight
Lead Time:
Quantity(Sets) 1 - 1 >1
Est. Time(days) 30 Negotiable
Customization:
OEM (Min. Order: 1 Sets)
Report Suspicious Activity
Overview
Quick Details
Type:
Tile Forming Machine
Production Capacity:
10-20m/min
Certification:
CE/ISO/TUV
Condition:
New
Place of Origin:
Hebei, China
Brand Name:
QJ
Voltage:
380V 50HZ 3Phases
Weight:
4T
Use:
Roof
Dimension(L*W*H):
8.2m*1.4m*1.4m
Tile Type:
Steel
Applicable Industries:
Manufacturing Plant
Key Selling Points:
Automatic
Product name:
Color Steel Standard Roofing Roll Forming Machine
Frame Structure:
Sidewall 16mm Steel Plate
Bearing Type:
6210 Standard
Connect Bar:
25mm Galvanized Steel
Transmission:
By chain, width 1.0inch
Forming Roller Station:
16 Steps
Hydraulic Pump Station:
5.5KW (Lichao Brand,Shanghai) with Valve (Huade Brand,Beijing)
Hydraulic Cutting System:
Steel plates welded, guide pillar type for long life cutting,
Cutting Blade Material:
Cr12Mov with heat treatment
Cutting Tolerance:
10M±1mm by inverter/PLC control
After-sales Service Provided:
Online support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Video technical support
Warranty:
1.5years
Supply Ability
Supply Ability:
20 Set/Sets per Month
Packaging & Delivery
Packaging Details
Color Steel Standard Roofing Roll Forming Machine is nude packing in the 40FT container , steel rope fixed and other components with plastic file packed.
If the machine is too long, we will divide it into two parts and pack them in one package with welding.
Port
Tianjin port,China
Lead Time :
Quantity(Sets) 1 - 1 >1
Est. Time(days) 30 To be negotiated

Color Steel Standard Roofing Roll Forming Machine

Product Description

This product is widely used in many kinds of industrial factory, civilian buildings, It has advantage of pretty appearance, durable using and so on. 

 

 technical detail

 

Under Frame

400H-beam, Welded structure

Shaft diameter(Solid)

70mm-0.01~-0.03(with key-way)

 

Shaft material(Hard)

High grade 45# steel,heated and quenched,cylindrical grinding,

 

Roller material(Hard)

Cr12,heated and

Quenched,polishing

   Bearing Type

Standard

Transmission Gear

Heat treatment

Motor Power

5.5KW(Lichao,Shanghai)

Forming Speed

10-20m/min(Non-Stop)

Hydraulic Cutting

Tracking Length To Cut

 Pump power

5.5 KW

Hydraulic pressure

20 Mpa

Voltage Standard

       380V/3Phases/50Hz

Cutting die

Cr12Mov, Quenched processed

Company Information

 

                                                                                                                                 

cangzhou forward roll forming machine machinery co ,ltd,         

ltd is cthemanufacture manufacture sepcialized ,in coid b

ending roll forming machine equipment and automatic pr

oduction line,the new company was established due to 

the need of the rapid development of international trade,

main products are color steel roll forming machine ,classi

cal glazed tile forming machine ,c/z puline machine for light steel structure building ,floor deck forming machine sandwich

panel production line ,fast guardrail roll forming 

line and various kind of full automatic cold bending

roll forming machine equipment.

 

we have approved certification of ce iso9001,the               

concept control everyone orocess and perfect all

products is curved in everyone mind ,each machine

will be via load carrying test before leaving factory,

problem machines will never be delivered to customer.

 

we are willing to promote the economic and technical

exchange with the word ,and do positive work to

enhance the between people from different countries,

we sincerely hope you and hand in hand ,create the

glorious future altogether.

 

Packaging & Shipping

 

customer visit

 

FAQ

A. Foreign commissioning

We will arrange our professional engineers to help you install and debug the machine well.   Buyer should pay$100 for each engineer every day and responsible for transportation (including round-trip ticket), insurance, and suitable accommodation.

B. warranty period

1.The warranty will be maintenance, maintain in the guarantee period of 18months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts to charge freely, which is in the conditions of correct operation.

2.If the equipment are out of work in the guarantee period, the buyer need our repairman to go to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory andaccommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.

C. Training

During installation and adjustment of the equipment, our engineers are able to provide the training that

buyer’s personnel request to operate and maintain the equipment.

Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc. 

D. services

Lifetime services to every customer.

Welcome to contact and visit us.Waiting for your cooperation sincerely.

 

Certification

 

FAQ

Q1. What's your payment terms and delivery time?

A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspectthe machine well and before delivery. Of course your payment terms are acceptable.After we get down payment, we will arrange production. About 30-45 days for delivery.

 

Q2. Do you have after -sales support?

A2: Yes, we are happy to provide advice and we also have skilled technicians available across theworld.

 

Q3. Do you sell only standard machines?

A3: No, most of our machines are built according to customers specifications, using top brand com-ponents.

 

Q4. What will you do if the machine is broken?

A4: We provide 18 months free warranty and free technical support for the whole life of anymachine.

If the broken parts can't repair, we can send the new parts replace the broken parts freely, but youneed pay the express cost by yourself. If it is beyond the warranty period, we can negotiate tosolve the problem, and we supply the technical support for the whole life of the equipment.

 

Q5. Can you be responsible for transport?

A5: Yes, please tell me the destination port or address. we have rich experience in transporting.

 

Q6. How to visit your company?

A6: 1) Fly to Beiing airport, By high speed train From Beiing Nan to Cangzhou Xi (1 hour).

2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.