highway rail guard roll forming machines

  • >=1 Sets
    $60,000.00
Model Number:
double laye rroll forming machine
Power(W):
5.5KW
Customization:
oem (Min. Order: 1 Sets)
Report Suspicious Activity
Overview
Quick Details
Warranty:
1.5 years
Type:
Tile Forming Machine
Production Capacity:
15-20m/min
Certification:
CE/ISO9001
Applicable Industries:
Manufacturing Plant
After Warranty Service:
Video technical support, Online support
Local Service Location:
None
Showroom Location:
None
Condition:
New
Tile Type:
Steel
Use:
Roof
Place of Origin:
Hebei, China
Brand Name:
qj
Voltage:
380V 50Hz 3phases
Dimension(L*W*H):
12500mx2300mx1500m
Weight:
9.5
After-sales Service Provided:
Online support, Video technical support, Engineers available to service machinery overseas
Key Selling Points:
High Safety Level
Roller station:
13 Steps
Under Frame:
450H-beam, Welded structure
Shaft diameter(Solid):
95mm-0.01~-0.03(with key-way)
Shaft material(Hard):
High grade 45# steel,heated and quenched,cylindrical grinding,
Roller material(Hard):
Cr12,heated and Quenched,polishing
Pre-cutter Material:
Cr12Mov
Motor Power:
5.5KW(Lichao,Shanghai)
Forming Speed:
10-15M/min
PLC System:
Delta Brand,Taiwan
Supply Ability
Supply Ability:
30 Set/Sets per Month
Packaging & Delivery
Packaging Details
hydraulic waves w beam steel highway guardrail rollformer guard rail crash barrier roll forming machine is nude packing in the 40 feet container , fixed well with oil rope , control cabinet and all the accessories with waterproof .
Port
Tianjin Port

highway rail guard roll forming machines

Product Description

 

 This product is widely used in many kinds of industrial factory, civilian buildings, and wall board for attached part product. It has advantage of pretty appearance, durable using and so on. 

two bumps highway road guardrail barrier cold roll forming machine

Uncoiler

Main forming machine

Hydraulic cutting

Electric system (PLC)

Hydraulic system

 

 

 technical detail

 

Roller station

18Steps

Under Frame

400H-beam, Welded structure

Shaft diameter(Solid)

70mm-0.01~-0.03(with key-way)

 

Shaft material(Hard)

High grade 45# steel,heated and quenched,cylindrical grinding,

 

Roller material(Hard)

Cr12,heated and

Quenched,polishing

   Bearing Type

Standard

Transmission Gear

Heat treatment

Motor Power

5.5KW(Lichao,Shanghai)

Forming Speed

0-20m/min(Non-Stop)

Main Structure

Welded Structural Steel

Hydraulic Cutting

Tracking Length To Cut

 Pump power

5.5 KW

Hydraulic pressure

20 Mpa

Voltage Standard

       380V/3Phases/50Hz

Cutting die

Cr12Mov, Quenched processed

 
 

hydraulic waves w beam steel highway guardrail rollformer guard rail crash barrier roll forming machine

 

 

 

 

 

 Rollers

High quality rollers will help to produce the beautiful and high quality profile. That will satisfy your customers.

Using high qualiy thick shaft, the strength is more durable.

 
 
 
 
 
 

 

 

 

Machine body

The main body of the body without welding, all the use of cast steel,  lead to the host body deformation.

 

 

 

 

 

 

 

 

 

 

 PLC Control System

Usually we prodvide the Delta PLC control system, but we can make that according to your need. 

 

 

 

 

 

 

 

 

 

two bumps highway road guardrail barrier cold roll forming machine

UncoilingFeeding—Roll forming—Cut to length—Cutting—Output table

 

 

 

 

 

Relational Production

Our Services

 

Pre-Sales Service

* Inquiry and consulting support. 

* Sample testing support. 

* View our Factory.

After-Sales Service

* Training how to instal the machine, training how to use the machine. 

* Engineers available to service machinery overseas

 

Company Information

 

 

Packaging & Shipping

 

 

 

customer visit

 

 

Certification

FAQ

A. Foreign commissioning

We will arrange our professional engineers to help you install and debug the machine well.   Buyer should pay$100 for each engineer every day and responsible for transportation (including round-trip ticket), insurance, and suitable accommodation.

B. warranty period

1.The warranty will be maintenance, maintain in the guarantee period of 18months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts to charge freely, which is in the conditions of correct operation.

2.If the equipment are out of work in the guarantee period, the buyer need our repairman to go to buyer’s factory, the buyer should be responsible for the tickets(including round-trip ticket), the fee of transportation to the buyer’s factory andaccommodation. Required to change spare parts, the buyer should afford the freight fee and we don’t ask extra fee.

C. Training

During installation and adjustment of the equipment, our engineers are able to provide the training that

buyer’s personnel request to operate and maintain the equipment.

Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc. 

D. services

Lifetime services to every customer.

Welcome to contact and visit us.Waiting for your cooperation sincerely.